Tentative Schedule

Date
Arrivals
Departures
Lab Activities
Ship Activities
Friday,
May 25



Complete M-AERI installation on Walton Smith
Saturday,
May 26
Ian Barton,
Andrew Jessup,
Ruth Fogelberg,
Hassan Ouaidrari



Sunday,
May 27
Simon Hook,
Ali Abtahi,
Marianne Edwards

Radiometer calibration against RSMAS waterbath black body (if desired)
Install and test radiometers
Monday,
May 28
Tim Nightingale,
Craig Donlon

Radiometer calibration against RSMAS waterbath black body (if desired)
Install and test radiometers
Tuesday,
May 29
Carol Johnson,
Joe Rice,
Jim Butler

Begin installation of NIST equipment.
Radiometer calibration against RSMAS waterbath black body (if desired)
Install and test radiometers and/or at sea if installation complete and weather conditions favorable.
Wednesday, May 30


Complete installation of NIST equipment.
Begin black body characterization
At sea
Thursday,
May 31

Andrew Jessup,
Peter Minnett,
Simon Hook
Black body characterization
At sea or return to RSMAS and begin offloading ship (if sailing took place on Tuesday)
Friday, June 1

Ali Abtahi
Black body characterization**
Pack up NIST equipment*
Offload ship
Saturday,
June 2

Carol Johnson,
Joe Rice,*
Jim Butler,*
Ian Barton,
Craig Donlon

Radiometer calibration against RSMAS waterbath black body (if desired)
Visit Explorer of the Seas   (if desired)
Sunday, June 3

Hassan Ouaidrari
Continue lab measurements if desired

Monday,
June 4


Continue lab measurements if desired




  * Could be delayed if needed
** Could be continued if needed

Last Revised: 17 May 2001