
As of May 26, 2001
|
Participant
|
Arrival date
|
Departure date
|
Instrument
|
Comments
|
| Ian Barton CSIRO Marine Labs |
May 26 |
June 2 |
DAR011, Lunchbox TASCO, Everest (maybe) Portable Black Body Target |
email |
| Craig Donlon European Commission Joint Research Centre |
May 28 |
June 2 |
ISAR-01 CASOTS blackbody cavity |
email |
| Mike Reynolds Brookhaven National Laboratory |
||||
| Simon Hook JPL |
May 27 |
May 31 |
3 nulling bbradiometers. 1 field portable bb. The field portable bb is a horizontal cone and should work with the NIST radiometer. |
email |
| Ali Abtahi JPL |
May 27 |
June 1 |
||
| Carol Johnson NIST |
May 29 |
June 2 |
EOS Thermal Transfer Radiometer
(TXR) NIST Water Bath Black Body (maybe) |
|
| Joe Rice NIST |
May 29 |
June 2 or later |
email |
|
| Jim Butler NASA Goddard Spece Flight Center |
May 29 |
June 2 or later |
||
| Hassan Ouaidrari Science Systems and Applications Incorporation (SSAI) NPOESS Preparatory Project (NPP) |
May 26 |
June 3 |
||
| Brian Ward CIMAS, Miami |
CASOTS black body |
|||
| Marianne Edwards AATSR Validation Scientist University of Leicester, UK |
May 27 |
June 3 |
email |
|
| Andrew T. Jessup Ruth Fogelberg Trina Litchendorf Applied Physics Laboratory University of Washington |
May 26 |
Jessup: May 31 Fogelberg and Litchendorf: later |
CIRIMS - Calibrated InfraRed In situ Measurement System Portable Blackbody for NIST to characterize |
email |
| Tim Nightingale Rutherforad Appleton Lab. UK |
May 28 |
June 2 |
SISTeR CASOTS black-body |
|
| Gary Wick, |
May 28 or 29 |
June 2 |
||
| Peter Minnett, Goshka Szczodrak, Kevin Maillet, Jennifer
Hanafin, John Brown, Erica key and others. |
On ship: M-AERI, 'Hard-hat' floats for sub-surface
temperature, All-sky camera, Meteorological sensors. In lab: NIST Water Bath Black Body |